Return to Building Permits Home Page
2008 Multifamily Building Permits Conway AR Faulkner County
2008 Building Permits for Multi-family Units
Sequence Date Bldg Permit # Builder Address Number of Units Elect. Plumbing  Mech Fee Gas  Square Footage Est. Cost Cost Per Sq. Ft Sq. Ft. per Unit Cost Per Unit
1 1/25/2008 B08-44 Salter Jeanna 3660 Bldg. 1 8 Keeling Del Mech Frey.. 139.2 4,640 320,000 68.97 580 $40,000
2 1/25/2008 B08-45 Salter Jeanna 3660 Bldg. 2  6 Keeling Del Mech Frey 139.2 4,640 240,000 51.72 773 40,000
3 1/25/2008 B08-46 Salter Jeanna 3660 Bldg. 3 6 Keeling Del Mech Frey 139.2 4,640 240,000 51.72 773 40,000
4 1/25/2008 B08-47 Salter Jeanna 3660 Bldg. 4 12 Keeling Del Mech Frey 278.4 9,280 400,000 43.10 773 33,333
5 1/30/2008 B08-60 Dave Grundfest S. German 855 33 44,040 3,222,275 73.17 1335 97,645
6 2/6/2008 B08-70 MBRK, LLC Western 321 8 KC Elect Faulkner MCM 852.48 14,208 800,000 56.31 1776 100,000
7 2/29/2008 B08-104 Manley Properties Spencer 1161 Bldg B 4 Taran Shearer 238.56 3,976 225,000 56.59 994 56,250
8 2/29/2008 B08-105 Manley Properties Spencer 1161 Bldg  4 Taran Shearer Tempco 238.56 3,976 225,000 56.59 994 56,250
9 5/9/2008 B08-237 Potts Construction College 2611 #6 6 BIL 145.98 4,866 250,000 51.38 811 41,667  
10 5/9/2008 B08-238 Potts Construction College 2611 #4 6 BIL 145.98 4,866 250,000 51.38 811 41,667
11 5/9/2008 B08-239 Potts Construction College 2611 #7 6 BIL 145.98 4,866 250,000 51.38 811 41,667
12 5/9/2008 B08-240 Potts Construction College 2611 #5 6 BIL 145.98 4,866 250,000 51.38 811 41,667
13 5/9/2008 B08-241 Potts Construction College 2611 #3 6 BIL 145.98 4,866 250,000 51.38 811 41,667
14 5/20/2008 B08-261 Potts Construction College 2611 #1 4 BIL 106.38 3,546 200,000 56.40 887 50,000
15 5/20/2008 B08-262 Potts Construction College 2611 #2 6 BIL 145.98 4,866 275,000 56.51 811 45,833
16 6/30/2008 B08-366 May Construction Galloway 1700 Bldg D * 29 2543.3 42,388 4,891,880 115.41 1096 126,514 **
17 6/30/2008 B08-368 May Construction Ellis 1050 Bldg C * 36 2912.7 48,545 4,993,859 102.87 1011 104,039 **
18 7/23/2008 B08-399 Ridge Construction Richsmith 2010 Bldg #1 (24 units) 24 Kimbel Mech MCM 1817.1 30,285 960,000 31.70 1262 40,000
19 7/24/2008 B08-400 Ridge Construction Richsmith 2010 Bldg #2 (24 units) 24 Kimbel Mech MCM 1817.1 30,285 960,000 31.70 1262 40,000
20 7/23/2008 B08-401 Ridge Construction Richsmith 2010 Bldg #3 (24 units) 24 Richardson MCM 1817.1 30,285 960,000 31.70 1262 40,000
21 7/23/2008 B08-402 Ridge Construction Richsmith 2010 Bldg #4 (24 units) 24 Richardson MCM 1817.1 30,285 960,000 31.70 1262 40,000
22 7/23/2008 B08-403 Ridge Construction Richsmith 2010 Bldg #5 (24 units) 24 Richardson MCM 1817.1 30,285 960,000 31.70 1262 40,000
23 7/23/2008 B08-404 Ridge Construction Richsmith 2010 Bldg #6 (24 units) 24 Elliott Richardson MCM 1817.1 30,285 960,000 31.70 1262 40,000
24 7/23/2008 B08-405 Ridge Construction Richsmith 2010 Bldg #7 (24 units) 24 Elliott Richardson MCM 1817.1 30,285 960,000 31.70 1262 40,000
25 7/23/2008 B08-406 Ridge Construction Richsmith 2010 Bldg (Club House) 0 Elliott Richardson MCM 313.8 5,230 350,000 66.92
26 7/23/2008 B08-407 Ridge Construction Richsmith 1985 (Penn. Bldg-16 unit) 16 Richardson 1197.4 19,956 640,000 32.07 1247 40,000
27 7/23/2008 B08-408 Ridge Construction Richsmith 1985 (Georgia Bldg 16 unit) 16 Richardson 1135.6 18,926 640,000 33.82 1183 40,000 **
28 7/25/2008 B08-409 Ridge Construction Richsmith 1985 (Main Bldg 16 units) 16 Richardson 1342.6 22,376 640,000 28.60 1399 40,000
29 7/23/2008 B08-410 Ridge Construction Richsmith 1985 (Club House) 0 Richardson 171.78 2,863 115,520 40.35
30 8/14/2008 B08-465 Roy Massey Salem 308 (11 units)  11 Shearer 343.2 11,440 527,000 46.07 1040 47,909
31 11/26/2008 B08-622 Watson Homes Robins 1410 Bldg A (6 units) 6 530.5 8,841 500,000 56.55 1474 83,333
32 11/26/2008 B08-623 Watson Homes Robins 1410 Bldg B (5 units) 5 442.08 7,368 416,000 56.46 1474 83,200
33 11/26/2008 B08-624 Watson Homes Robins 1410 Bldg C (4 units) 4 353.75 5,895 333,000 56.49 1474 83,250
34 11/26/2008 B08-625 Watson Homes Robins 1410 Bldg D (4 units) 4 353.75 5,895 333,000 56.49 1474 83,250
35 11/26/2008 B08-626 Watson Homes Robins 1410 Bldg E (5 units) 5 442.08 7,368 416,000 56.46 1474 83,200
36 11/17/2008 B08-608 SHIV Hospitalty Sanders 2350 (laquinnta Inn) 68 units 68 4145.2 41,452 2,000,000 48.25 610 29,412 ***
37 12/3/2008 B08-628 Lindsey Const. South Salem 1710 (12 units) 12 Fayetteville 838.8 13,980 425,000 30.40 1165 35,417
38 12/3/2008 B08-629 Lindsey Const. South Salem 1720 (12 units) 12 Fayetteville 838.8 13,980 425,000 30.40 1165 35,417
39 12/3/2008 B08-630 Lindsey Const. South Salem 1730 (12 units) 12 Fayetteville 838.8 13,980 425,000 30.40 1165 35,417
40 12/3/2008 B08-631 Lindsey Const. South Salem 1740 (12 units) 12 Fayetteville 663.6 11,060 375,000 33.91 922 31,250
41 12/3/2008 B08-632 Lindsey Const. South Salem 1750 (12 units) 12 Fayetteville 663.6 11,060 375,000 33.91 922 31,250
42 12/3/2008 B08-633 Lindsey Const. South Salem 1760 (12 units) 12 Fayetteville 838.8 13,980 425,000 30.40 1165 35,417
43 12/3/2008 B08-634 Lindsey Const. South Salem 1800 (12 units) 12 Fayetteville 838.8 13,980 425,000 30.40 1165 35,417
44 12/3/2008 B08-635 Lindsey Const. South Salem 1810 (12 units) 12 Fayetteville 838.8 13,980 425,000 30.40 1165 35,417
45 12/3/2008 B08-636 Lindsey Const. South Salem 1820 (12 units) 12 Fayetteville 838.8 13,980 425,000 30.40 1165 35,417
46 12/3/2008 B08-637 Lindsey Const. South Salem 1830 (12 units) 12 Fayetteville 838.8 13,980 425,000 30.40 1165 35,417
47 12/3/2008 B08-638 Lindsey Const. South Salem 1840 (12 units) 12 Fayetteville 838.8 13,980 425,000 30.40 1165 35,417
48 12/3/2008 B08-639 Lindsey Const. South Salem 1850 (12 units) 12 Fayetteville 838.8 13,980 425,000 30.40 1165 35,417
49 12/3/2008 B08-640 Lindsey Const. South Salem 1860 (12 units) 12 Fayetteville 838.8 13,980 425,000 30.40 1165 35,417
50 12/3/2008 B08-641 Lindsey Const. South Salem 1870 (12 units) 12 Fayetteville 838.8 13,980 425,000 30.40 1165 35,417
51 12/4/2008 B08-642 Hobb's Const Sixth Street 610 Bldg. 5 (4 units) 4 3,588 160,000 44.59 897 40,000
52 12/4/2008 B08-643 Hobb's Const Sixth Street 610 Bldg. 6 (4 units) 4 3,588 160,000 44.59 897 40,000
53 12/4/2008 B08-644 Hobb's Const Sixth Street 610 Bldg. 4 (4 units) 4 3,588 160,000 44.59 897 40,000
54 12/4/2008 B08-645 Hobb's Const Sixth Street 610 Bldg. 3 (4 units) 4 Lewis & Son 215.28 3,588 160,000 44.59 897 40,000
Total Units 689 786,912 $37,403,534 47.53 1142
* The Village at Hendrix College, four story units with commercial rental on the first floor.  
** Cost and area reduced by 25% to eliminate commercial area for computing Sq. Ft. and cost per unit to reflect cost and size of residential units only
***  This permit is for a hotel and hotels are classified as multi-family units
Total Units 505 582,680 30,913,534 53.05 1154 61,215
 
* The Village at Hendrix College, four story units with commercial rental on the first floor.    
** Cost and area reduced by 25% to eliminate commercial area for computing Sq. Ft. and cost per unit to reflect cost and size of residential units only